Jackson Park Problem Reports

This site is a project of the Jackson Park Advisory Council. Its goal is to allow users of Jackson Park to report issues that they would like the council to amplify.

The council will review issues periodically and decide on how to move them forward.

We encourage users to also report issues to Chicago 311 and the Park District.

Problem Reports

Report a Problem

Filtered by Zone: Area 1

Filter by zone: Area 1 Area 3 Area 2

Filter by priority: high

Filter by project: 2024 JPAC Park Condition Survey

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Landscaping growing thru benches and fences. From the caliper of the trees and bushes at benches and fences where this situation occurs, one assumes that CPD has been walking past these situations for years/decades and not maintaining these areas. What is CPD's response?

Location:

Jackson Park Phase 1 Area

Observed: 2024-05-18

Reported: 2024-05-20

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Trunks of tree and bushes are completely surrounded by plantings right up to the trunk, no clear space. This differs notably from approach to trees on Midway Plaisance where spreading mulch around trees is a major priority. Need to understand landscaping guidelines used by CPD in Jackson Park, different guidelines for different locales, etc.

Location:

Jackson Park Phase 1 Area

Observed: 2024-05-18

Reported: 2024-05-20

Category: Landscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

CDOT did a good job with new sidewalks along Hayes, but it did nothing to link with/repair/improve park paths (asphalt or otherwise)leading north from sidewalks (presumably because such maintenance was a CPD responsibility).

Location:

Jackson Park: Phase 1 Area

Observed: 2024-05-18

Reported: 2024-05-20

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Park path leading to Wooded Isle Bridge (next to baseball field) deteriorated in several sections.

Location:

Near Wooded Isle Bridge

Observed: 2024-05-18

Reported: 2024-05-20

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Path meeting sidewalk, west of bridge by Statue intersection: rough gap to be filled in. Ditto for second path west of bridge, opposite Statue.

Location:

Near Statue intersection

Observed: 2024-05-18

Reported: 2024-05-20

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Asphalt path leading north, just east of Hayes Bridge needs repair where it meet Hayes Drive sidewalk.

Location:

Hayes Bridge

Observed: 2024-05-18

Reported: 2024-05-20

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

West End of Hayes Bridge-washout under new sidewalk and west end of bridge edge. CPD or CDOT should repair ASAP.

Location:

West end of Hayes Bridge

Observed: 2024-05-18

Reported: 2024-05-20

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Examples of distressed trees combined with significant overgrowth of plantings are included in the attached file. This situation was observed in many locations throughout the study area.

Location:

Phase 1 Area off Hayes Drive

Observed: 2024-05-18

Reported: 2024-05-19

Category: Landscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Significant potholes were observed throughout the Phase 1 Area, collecting standing water, debris, etc. These potholes are in need of patching. Representative photos are attached.

Location:

Phase 1 Area off Hayes Drive.

Observed: 2024-05-18

Reported: 2024-05-19

Category: Hardscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Barren planting area adjacent to basketball courts. Could this area be trimmed out with small stones/rocks or replanted?

Location:

Near basketball courts Phase 1 Area.

Observed: 2024-05-18

Reported: 2024-05-19

Category: Landscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Observed overgrown planting areas along all paths in the Phase 1 area. Does CPD have a standard for trimming growth back from a path? These areas are also collecting litter and debris. Representative photos are attached.

Location:

Pedestrian walking paths in the Phase 1 Area.

Observed: 2024-05-18

Reported: 2024-05-19

Category: Landscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Identified examples of many distressed trees throughout area, approximately 35 acres. Some of these trees are near areas used by park guests and could be a life safety matter.

Location:

Trees were observed throughout the Phase 1 Area.

Observed: 2024-05-18

Reported: 2024-05-19

Category: Landscaping

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment

Jackson Park: Condition Assessment of Phase 1 Area

1 park visitors share this problem

Description:

Parking lots in Phase 1 area: Tree islands are overgrown with weeds, and then collects litter. Is there a CPD guideline for this condition? Is mulch available for the islands? Mulch applications can control weed.

Location:

Parking lots off Hayes Drive in Phase 1 area.

Observed: 2024-05-18

Reported: 2024-05-19

Category: Parking Areas

Zone: Area 1

Project: 2024 JPAC Park Condition Survey

Status: Reviewed By Pac

Log In to Comment